EPISODE · Sep 24, 2019 · 3 MIN
2019 09-23 Ceil Corcoran says $30,000 for a new pool pump was the main expense for Parks & Recreation
from WBEX-AM Podcast
Ceil Corcoran saw Parks & Recreation funds adjusted to pay for several big-ticket items, including electrical bills and equipment repairs. But she says $30,000 for a new pool pump was the main expense.
Embed this episode
NOW PLAYING
2019 09-23 Ceil Corcoran says $30,000 for a new pool pump was the main expense for Parks & Recreation
0:00
3:40
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of WBEX-AM Podcast?
This episode is 3 minutes long.
When was this WBEX-AM Podcast episode published?
This episode was published on September 24, 2019.
Can I download this WBEX-AM Podcast episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!