2025.12.01 | Grid Reliability Crisis: Feds Force Thermal Plants to Stay On episode artwork

EPISODE · Dec 1, 2025 · 4 MIN

2025.12.01 | Grid Reliability Crisis: Feds Force Thermal Plants to Stay On

from Current Events - The Electric Utility Today · host Edmundo Rodriguez

The federal government just invoked emergency powers under the Federal Power Act, forcing critical thermal plants like Eddie Stone and JH Campbell to stay online through February 2026—signaling a severe grid reliability crisis for Winter 25/26. We break down the implications of this unprecedented Federal Action, dissecting the collapse of stakeholder consensus at PJM over what to do about 30 GW of new data center load. Learn how the intense battle over retiring thermal plants and regulatory chaos is creating a massive capacity gap and why Blackstone is betting billions on physical hardware right now. Tune in to understand the critical puzzle: How the industry can possibly finance the thousands of megawatts of new dispatchable generation needed when commissions are actively compressing utility investment returns.

Episode metadata supplied by the publisher feed · Published Dec 1, 2025

Embed this episode

NOW PLAYING

2025.12.01 | Grid Reliability Crisis: Feds Force Thermal Plants to Stay On

0:00 4:32

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Current Events - The Electric Utility Today?

This episode is 4 minutes long.

When was this Current Events - The Electric Utility Today episode published?

This episode was published on December 1, 2025.

Can I download this Current Events - The Electric Utility Today episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!