24. How It Works: Facilities episode artwork

EPISODE · Aug 21, 2019 · 38 MIN

24. How It Works: Facilities

from The Hog Pod with Bo Mattingly

Have you ever wondered what goes into getting Arkansas' top-class facilities ready for players, coaches and fans alike? We did. And we sat down with associate AD for facilities Justin Maland to get the inside scoop, starting with the new grass surface that was installed at Razorback Stadium (2:03). We get into the 20,000-foot view of managing facilities on a college campus and the facilities "arms race" (7:11). We talk about everything that went into the north endzone project (15:44) and the upgrades coming to Baum-Walker Stadium (22:35). Justin talks about working for Norm DeBriyn and the baseball program and getting into facilities management (28:10).

NOW PLAYING

24. How It Works: Facilities

0:00 38:03

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of The Hog Pod with Bo Mattingly?

This episode is 38 minutes long.

When was this The Hog Pod with Bo Mattingly episode published?

This episode was published on August 21, 2019.

What is this episode about?

Have you ever wondered what goes into getting Arkansas' top-class facilities ready for players, coaches and fans alike? We did. And we sat down with associate AD for facilities Justin Maland to get the inside scoop, starting with the new grass...

Can I download this The Hog Pod with Bo Mattingly episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!