Skip to content
256: Props to Canada -  Building Wind Turbines episode artwork

Feb 26, 2025 32 min

256: Props to Canada - Building Wind Turbines

from Still To Be Determined

https://youtu.be/Bif5xp62fyY Matt and Sean talk about the crazy logistics of building a Canadian wind-turbine project. How difficult is it to build a wind farm? Watch the Undecided with Matt Ferrell episode, The Hidden Work Behind Wind Energy https://youtu.be/rKPYy8RF1RU?list=PLnTSM-ORSgi7uzySCXq8VXhodHB5B5OiQ YouTube version of the podcast: https://www.youtube.com/stilltbdpodcast Get in touch: https://undecidedmf.com/podcast-feedback Support the show: https://pod.fan/still-to-be-determined Follow us on X: @stilltbdfm @byseanferrell @mattferrell or @undecidedmf Undecided with Matt Ferrell: https://www.youtube.com/undecidedmf ★ Support this podcast ★

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

256: Props to Canada - Building Wind Turbines

0:00 32:01

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Still To Be Determined?

This episode is 32 minutes long.

When was this Still To Be Determined episode published?

This episode was published on February 26, 2025.

Can I download this Still To Be Determined episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.