EPISODE · Aug 26, 2020 · 34 MIN
26: Tideway, Acceleration and Square Holes
from Re:Construction · host The Construction Index
Bishop & Taylor discuss delays to the £4bn Thames Tideway project as well as the transport secretary’s new acceleration unit and a drill attachment that cuts square holes.
Embed this episode
NOW PLAYING
26: Tideway, Acceleration and Square Holes
0:00
34:56
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Re:Construction?
This episode is 34 minutes long.
When was this Re:Construction episode published?
This episode was published on August 26, 2020.
Can I download this Re:Construction episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!