#269 The Pipeline to Net Zero episode artwork

EPISODE · Apr 4, 2024 · 41 MIN

#269 The Pipeline to Net Zero

from Engineering Matters

It will be just as important to upgrade pipeline networks for the energy transition, as it is the electric grid. These will carry carbon dioxide and hydrogen, along with ammonia and biogas. They will enable carbon capture, local hydrogen for fuel intensive industry and transport, and for export. Governments around the world have struggled to develop these networks. The UK’s strategy is to create clusters of carbon emitters to make use of offshore carbon storage. These can take advantage of legacy pipeline infrastructure in historic industrial regions, and bring new opportunities to struggling economies. In this episode, we speak to pipeline and energy experts about the technical and project management challenges of building these new networks. Guests Laura Hughes, energy sector director, Costain Sean Gleeson, project manager, PX  Niku Nobakhti, project manager, Costain Ewan Brodie, consultancy and advisory manager, CostainThe post #269 The Pipeline to Net Zero first appeared on Engineering Matters.

Episode metadata supplied by the publisher feed · Published Apr 4, 2024

Embed this episode

NOW PLAYING

#269 The Pipeline to Net Zero

0:00 41:10

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Engineering Matters?

This episode is 41 minutes long.

When was this Engineering Matters episode published?

This episode was published on April 4, 2024.

Can I download this Engineering Matters episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!