#272 Designing Dinorwig: Inside Electric Mountain

from Engineering Matters

In late 1973 the UK’s Central Electricity Generating Board gained parliamentary approval to build the largest and most difficult pumped storage hydroelectric power station in its history. It was the largest civil engineering contract ever awarded by the government and became the biggest construction project in Europe. Engineering teams had to burrow 750m deep into...

Episode metadata supplied by the publisher feed · Published Apr 25, 2024

Embed this episode

Ready to play

#272 Designing Dinorwig: Inside Electric Mountain

0:00 41:22

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Engineering Matters?

This episode is 41 minutes long.

When was this Engineering Matters episode published?

This episode was published on April 25, 2024.

Can I download this Engineering Matters episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!