#278 How to Sell $500M of Batteries Before You Build a Factory | Landon Mossburg (Peak Energy) episode artwork

EPISODE · Feb 18, 2026 · 57 MIN

#278 How to Sell $500M of Batteries Before You Build a Factory | Landon Mossburg (Peak Energy)

from CleanTechies Podcast · host Silas Mähner and Climate Cowboys Podcast

00:00 – Intro: The $500M deal with Jupiter Power.02:15 – Landon’s Background: Lessons from Tesla and Northvolt.06:30 – The "Magnet Hire": How to attract A-Players by hiring one star first.12:00 – Why Sodium-Ion?: The cost and supply chain advantage over Lithium.18:45 – The Jupiter Power Deal: How they negotiated a massive off-take agreement.24:10 – "Engineering Bankability": Selling the manufacturing roadmap, not just the cell.32:00 – Supply Chain: Why Peak Energy avoids conflict minerals and China reliance.41:00 – The Grid Challenge: Why batteries need to last 25 years in the desert.48:00 – Scaling Speed: How to move faster than traditional industrial giants.53:00 – Hiring: The specific traits Landon looks for in executives. This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit climatecowboys.substack.com/subscribe

Episode metadata supplied by the publisher feed · Published Feb 18, 2026

Embed this episode

Ready to play

#278 How to Sell $500M of Batteries Before You Build a Factory | Landon Mossburg (Peak Energy)

0:00 57:26

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of CleanTechies Podcast?

This episode is 57 minutes long.

When was this CleanTechies Podcast episode published?

This episode was published on February 18, 2026.

Can I download this CleanTechies Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!