EPISODE · Oct 30, 2024 · 45 MIN
#299c Highways UK Live – Next Generation Asset Management
from Engineering Matters
In 2024, National Highways completely closed parts of the M25, London’s orbital motorway. This blockage in the arterial system of the UK economy wasn’t a mistake. Instead, it was an example of meticulously planned surgery, performed by experts. In the previous episode of this mini-series, recorded live at Highways UK, we saw how data is...
Embed this episode
Ready to play
#299c Highways UK Live – Next Generation Asset Management
0:00
45:44
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
Frequently Asked Questions
How long is this episode of Engineering Matters?
This episode is 45 minutes long.
When was this Engineering Matters episode published?
This episode was published on October 30, 2024.
Can I download this Engineering Matters episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!