EPISODE · Mar 24, 2014 · 5 MIN
3/24/14: "Digital manufacturing site: Olympics repeat, weapons mill, or both?"
from Inside Chicago Government
When private interests force TIF recipients to honor job guarantees; the digital manufacturing institute's "ultimate goal" of defense products; and how the institute announcement resembles Chicago's winning of the U.S. Olympics bid. Length 5.5 minutes.
Embed this episode
NOW PLAYING
3/24/14: "Digital manufacturing site: Olympics repeat, weapons mill, or both?"
0:00
5:30
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Inside Chicago Government?
This episode is 5 minutes long.
When was this Inside Chicago Government episode published?
This episode was published on March 24, 2014.
Can I download this Inside Chicago Government episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!