308: Israel Prime Minister in Washington D.C - Will Address Joint Session of Congress + Royal Australian Navy Destroyer Employs Naval Strike Missile at RIMPAC 2024 + US Army Reports 6 Month Schedule Delay in JLTV Production + More episode artwork

EPISODE · Jul 23, 2024 · 25 MIN

308: Israel Prime Minister in Washington D.C - Will Address Joint Session of Congress + Royal Australian Navy Destroyer Employs Naval Strike Missile at RIMPAC 2024 + US Army Reports 6 Month Schedule Delay in JLTV Production + More

from I - On Defense Podcast · host I - On Defense

For review:1. Royal Australian Navy Destroyer Employs Naval Strike Missile at RIMPAC 2024.Royal Australian Navy destroyer HMAS Sydney (DDG-42) successfully fired a Naval Strike Missile and sank former amphibious assault ship USS Tarawa (LHA-1) in the waters off Hawaii during the biennial Rim of the Pacific 2024 exercise.2. China & Philippines open a direct line of communication between respective presidential offices to prevent escalation of events during territorial disputes in the South China Sea.3. Israel Prime Minister in Washington D.C. (Monday).PM Netanyahu will address a joint session of the US Congress on Wednesday and will meet with President Joe Biden in the White House on Thursday. 4. At Farnborough Air Show, Global Combat Air Programme (GCAP) partners (Italy, Japan, & UK), unveil a concept of the future crewed fighter. The concept design is a delta wing shape, with increased wingspan ,compared to previous iterations.5. At Farnborough, USAF Secretary comments on the Next-Generation Air Dominance (NGAD) fighter program.6. US releases Arctic Strategy document: 2024 National Strategy for the Arctic Region.7. US Army Reports 6 Month Schedule Delay in JLTV Production. According to PEO Combat Support & Combat Systems Support Spokesperson: AM General’s initial delivery of Joint Light Tactical Vehicles (JLTVs), has been delayed by six months- due to challenges starting up a new production line.

Episode metadata supplied by the publisher feed · Published Jul 23, 2024

Embed this episode

For review: 1. Royal Australian Navy Destroyer Employs Naval Strike Missile at RIMPAC 2024. Royal Australian Navy destroyer HMAS Sydney (DDG-42) successfully fired a Naval Strike Missile and sank former amphibious assault ship USS Tarawa (LHA-1) in the waters off Hawaii during the biennial Rim of the Pacific 2024 exercise. 2. China & Philippines open a direct line of communication between respective presidential offices to prevent escalation of events during territorial disputes in the So...

Distinct summary based on available episode metadata or transcript content.

Ready to play

308: Israel Prime Minister in Washington D.C - Will Address Joint Session of Congress + Royal Australian Navy Destroyer Employs Naval Strike Missile at RIMPAC 2024 + US Army Reports 6 Month Schedule Delay in JLTV Production + More

0:00 25:57

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of I - On Defense Podcast?

This episode is 25 minutes long.

When was this I - On Defense Podcast episode published?

This episode was published on July 23, 2024.

Can I download this I - On Defense Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!