Skip to content
32: You spin me right round - wind turbine viewer feedback episode artwork

Aug 24, 2020 43 min

32: You spin me right round - wind turbine viewer feedback

from Still To Be Determined

https://youtu.be/mW436OJ6ZNc Matt and Sean talk about recycling wind turbines or maybe just growing some--the debate over the environmental impact of new technologies, and how some people aren't looking at the big picture enough when it comes to energy production. Episode: https://youtu.be/WsswrLKlinU Get in touch: https://undecidedmf.com/podcast-feedback Undecided with Matt Ferrell: https://www.youtube.com/undecidedmf ★ Support this podcast ★

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

32: You spin me right round - wind turbine viewer feedback

0:00 43:37

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Still To Be Determined?

This episode is 43 minutes long.

When was this Still To Be Determined episode published?

This episode was published on August 24, 2020.

Can I download this Still To Be Determined episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.