EPISODE · Apr 10, 2025 · 48 MIN
#324 A Shift of Power on Europe’s Borders
from Engineering Matters
This February, with the flick of a switch, there was a vast shift of power on Europe’s borders. The Baltic states’ electrical grids, built in the 1960s while these countries were forcibly incorporated into the Soviet Union, had been under the control of Moscow. In one weekend, the transmission system operators in Latvia, Lithuania, and...
Embed this episode
Ready to play
#324 A Shift of Power on Europe’s Borders
0:00
48:11
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
Frequently Asked Questions
How long is this episode of Engineering Matters?
This episode is 48 minutes long.
When was this Engineering Matters episode published?
This episode was published on April 10, 2025.
Can I download this Engineering Matters episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!