#339 Integrated Contracts and Innovative Delivery episode artwork

EPISODE · Jul 24, 2025 · 40 MIN

#339 Integrated Contracts and Innovative Delivery

from Engineering Matters

On two major road projects in the UK work was completed on time and under budget. But not every project can claim such success. Defects, delays and cost overruns plague projects around the world. Projects such as those at Junction 10 on the M25 London orbital motorway, and on a stretch of the A19 near...

Episode metadata supplied by the publisher feed · Published Jul 24, 2025

Embed this episode

Ready to play

#339 Integrated Contracts and Innovative Delivery

0:00 40:41

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Engineering Matters?

This episode is 40 minutes long.

When was this Engineering Matters episode published?

This episode was published on July 24, 2025.

Can I download this Engineering Matters episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!