35. Turbo Pendolinos for HS2? Is a directing mind required & why Tornado cost £1m to overhaul  episode artwork

EPISODE · May 30, 2024 · 1H 7M

35. Turbo Pendolinos for HS2? Is a directing mind required & why Tornado cost £1m to overhaul

from Green Signals · host Green Signals Productions

HS2 Phase 2 to Manchester may have been cancelled but the problems have only begun. How to deal with the 54 brand new Alstom / Hitachi trains on order? What about fewer seats being available on Britain’s most valuable route, London – Manchester? And then there’s Euston station – what on earth do we build now? Chris Gibb, a senior figure in the railway industry previously a director of Virgin Cross Country, Virgin West Coast and Network Rail to name but three thinks he knows what to do – and he’s written it down in a dramatic new plan which we discuss in detail with him. Andrew Haines has appeared at the Public Accounts Committee where he and the DfT officials also present seemed to reject the notion of a directing mind. The Labour Party, possibly the next party of Government, appear to think otherwise. Is there a showdown coming? There’s mixed news in the Heritage Sector. In an interview with Steve Davies MBE, Chairman of the A1 Steam Locomotive Trust which owns celebrity locomotive 60163 Tornado, we discuss how its recent general overhaul cost £1m as well as the challenges faced when installing a modern electronic signalling system onto a steam engine. Then we consider the desperate times faced at the Nene Valley Railway which needs £300,000 to stay afloat. And, there’s good news from the Community Rail sector. We discuss Community Rail week and the marvellous work volunteers carry out to promote their loco lines and stations. Green Signals: Website - ⁠http://www.greensignals.org⁠ YouTube - ⁠https://www.youtube.com/@GreenSignals⁠ Newsletter - ⁠http://www.greensignals.org/#mailing-list⁠ Follow: X (Twitter) - ⁠https://twitter.com/greensignallers⁠ LinkedIn - ⁠https://www.linkedin.com/company/green-signals-productions-ltd⁠ Instagram - ⁠https://instagram.com/greensignallers⁠ Credits: Presenters - Nigel Harris (@railnigel on X) & Richard Bowker CBE (@SRichardBowker). General Manager: Stef Foster (@stefatrail) With thanks to the A1 Steam Locomotive Trust for additional material

Episode metadata supplied by the publisher feed · Published May 30, 2024

Embed this episode

Ready to play

35. Turbo Pendolinos for HS2? Is a directing mind required & why Tornado cost £1m to overhaul

0:00 1:07:37

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Green Signals?

This episode is 1 hour and 7 minutes long.

When was this Green Signals episode published?

This episode was published on May 30, 2024.

Can I download this Green Signals episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!