Skip to content
#357b Well-Grounded Decisions: Design Development episode artwork

Dec 19, 2025 25 min

#357b Well-Grounded Decisions: Design Development

from Engineering Matters

Without a clear understanding of ground conditions, unquantified risk can be transferred from project owner to lead contractors when a contract is signed. In the first episode of this three part series, we explored how geophysical screening, using non-intrusive methods, can be used to reduce uncertainty in site selection and provide clarity on construction costs...

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

#357b Well-Grounded Decisions: Design Development

0:00 25:35

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Engineering Matters?

This episode is 25 minutes long.

When was this Engineering Matters episode published?

This episode was published on December 19, 2025.

Can I download this Engineering Matters episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.