#363 Uncrewed Vessels and Unprecedented Data
from Engineering Matters
In its seventh Allocation Round the UK executed the largest offshore wind auction in European history, putting pen to paper on 8.4GW of new capacity, enough to power 10 million homes. Allocation Round 8 is expected to be even more ambitious, as the UK looks to upgrade its radar systems to enable a 10GW installation,...
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of Engineering Matters?
This episode is 36 minutes long.
When was this Engineering Matters episode published?
This episode was published on March 26, 2026.
Can I download this Engineering Matters episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.