4/3/25 SCCRTC - P8 - Highway 1 41st Avenue to Soquel Drive Project cost overruns episode artwork

EPISODE · May 12, 2025 · 18 MIN

4/3/25 SCCRTC - P8 - Highway 1 41st Avenue to Soquel Drive Project cost overruns

from Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks

Caltrans request for additional funding to cover cost overruns on the Construction Capital component of the project.The agenda is here: https://www.sccrtc.org/wp-content/uploads/2025/03/2025-04-03-RTC-agenda-packet.pdf The original video from Community TV is here: https://youtu.be/ipxF-7iNnnE?si=WZGnuoaVYPbhrP0T

Episode metadata supplied by the publisher feed · Published May 12, 2025

Embed this episode

NOW PLAYING

4/3/25 SCCRTC - P8 - Highway 1 41st Avenue to Soquel Drive Project cost overruns

0:00 18:54

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks?

This episode is 18 minutes long.

When was this Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks episode published?

This episode was published on May 12, 2025.

Can I download this Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!