4 Different Indexes to Forecast the Project Final Cost Using the Earned Value Analysis

from 5 Minutes Podcast with Ricardo Vargas · host Ricardo Viana Vargas

In this podcast, Ricardo talks about the indices of earned value in the project. He explains that the great secret of earned value is to evaluate current performance to project the future. Ricardo also explains how to analyze the rate of time or cost when it is less than, equal to or greater than one.

Episode metadata supplied by the publisher feed · Published Mar 21, 2012

Embed this episode

NOW PLAYING

4 Different Indexes to Forecast the Project Final Cost Using the Earned Value Analysis

0:00 7:48

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of 5 Minutes Podcast with Ricardo Vargas?

This episode is 7 minutes long.

When was this 5 Minutes Podcast with Ricardo Vargas episode published?

This episode was published on March 21, 2012.

Can I download this 5 Minutes Podcast with Ricardo Vargas episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!