4 Mechanisms for Forecast the Project Schedule and Cost episode artwork

EPISODE · Feb 6, 2012 · 7 MIN

4 Mechanisms for Forecast the Project Schedule and Cost

from 5 Minutes Podcast with Ricardo Vargas · host Ricardo Viana Vargas

In this podcast, Ricardo talks about the methods of forecasting project schedule and cost. He comments that there are four methods of predicting future project performance: time series methods, causal/econometrics methods, judgmental methods and other methods. Ricardo explains and gives examples of each method.

Episode metadata supplied by the publisher feed · Published Feb 6, 2012

Embed this episode

NOW PLAYING

4 Mechanisms for Forecast the Project Schedule and Cost

0:00 7:18

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of 5 Minutes Podcast with Ricardo Vargas?

This episode is 7 minutes long.

When was this 5 Minutes Podcast with Ricardo Vargas episode published?

This episode was published on February 6, 2012.

Can I download this 5 Minutes Podcast with Ricardo Vargas episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!