43: Project Matador: Fermi's 'Hyperscale' Data Center Complex Hitting Resistance in the Texas Panhandle episode artwork

EPISODE · Apr 24, 2026 · 49 MIN

43: Project Matador: Fermi's 'Hyperscale' Data Center Complex Hitting Resistance in the Texas Panhandle

from Deceleration Podcast · host Marisol Cortez & Greg Harman

Send us Fan Mail“Project Matador” outside of Amarillo, Texas, pairs Fermi America and the Texas Tech University System seeking a pod of “hyperscale” data centers over 6,000 acres across a privately owned and operated electric grid. Already permitted for 6GW of power with 93 planned gas-fired turbines and seeking to build multiple nuclear power plants, this is a truly climate-breakdown accelerating power footprint that brings severe water concerns atop one of the planet’s most imperiled major aquifers that is relied upon by tens of thousands of farmers and ranchers (you know, the folks who produce our food and clothes, at least for those of us not wearing plastic). Deceleration’s guest this week is Kendra Seawright of Women’s March. She is doing the work of organizing the resistance on the ground that is pushing back on the many assumptions and assertions of what this project is good for—if anything. As more MAGA supporters start to split with President Trump on crypto and AI data centers, this means new challenges to foster a diverse hub of voices. We wanted to hear more about what that looks like and what lessons there may be for others in the trenches. “We didn’t expect a rubber stamp,” Seawright told us about the permit already in Fermi’s pocket. “We want real honest communication about what this is going to mean for our health and future generations too.” Next week is the deadline for a new permit application to take power production to 11GW (with a goal of 17GW of power and resulting pollution).Details/Public Comment: https://www.amarilloaction.org/aiPast Deceleration Data Center Coverage:The Texas Data Center Rebellion Has BegunCritical Texas Data Center Fights Happening Right NowSupport the showDeceleration.news: 'For the Earth. And all Her families.'

Episode metadata supplied by the publisher feed · Published Apr 24, 2026

Embed this episode

Send us Fan Mail “Project Matador” outside of Amarillo, Texas, pairs Fermi America and the Texas Tech University System seeking a pod of “hyperscale” data centers over 6,000 acres across a privately owned and operated electric grid. Already permitted for 6GW of power with 93 planned gas-fired turbines and seeking to build multiple nuclear power plants, this is a truly climate-breakdown accelerating power footprint that brings severe water concerns atop one of the planet’s most imperiled major...

Distinct summary based on available episode metadata or transcript content.

Ready to play

43: Project Matador: Fermi's 'Hyperscale' Data Center Complex Hitting Resistance in the Texas Panhandle

0:00 49:04

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Deceleration Podcast?

This episode is 49 minutes long.

When was this Deceleration Podcast episode published?

This episode was published on April 24, 2026.

Can I download this Deceleration Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!