45. HS2: Should we just cancel it now?! episode artwork

EPISODE · Aug 8, 2024 · 1H 13M

45. HS2: Should we just cancel it now?!

from Green Signals · host Green Signals Productions

Without HS2, the West Coast Main Line will soon be rammed. We speak to experts Simon Pilkington and William Barter to explain why. We ask whether the problematic Trent Valley bottleneck can ever be resolved on the WCML. And controversially, we ask whether we should just cancel HS2 right now. Is there any point in continuing if we only build Phase 1? We also bring you some little teasers from our upcoming videos on Network Rail’s New Measurement Train (the Flying Banana as it is often known), and the Global Centre of Rail Excellence (GCRE) in South Wales. Green Signals: Website - http://www.greensignals.org YouTube - https://www.youtube.com/@GreenSignals Newsletter - http://www.greensignals.org/#mailing-list Follow: X (Twitter) - https://twitter.com/greensignallers LinkedIn - https://www.linkedin.com/company/green-signals-productions-ltd Instagram - https://instagram.com/greensignallers Credits: Presenters - Nigel Harris (@railnigel on X) & Richard Bowker CBE (@SRichardBowker). General Manager: Stef Foster (@stefatrail)

Episode metadata supplied by the publisher feed · Published Aug 8, 2024

Embed this episode

NOW PLAYING

45. HS2: Should we just cancel it now?!

0:00 1:13:21

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Green Signals?

This episode is 1 hour and 13 minutes long.

When was this Green Signals episode published?

This episode was published on August 8, 2024.

Can I download this Green Signals episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!