#471 - John’s Critical Path, Elis’s 0.0% Curry and Dave’s Not So Silent Alarm episode artwork

EPISODE · Sep 12, 2025 · 1H 5M

#471 - John’s Critical Path, Elis’s 0.0% Curry and Dave’s Not So Silent Alarm

from Elis James and John Robins

What starts off as a huge day for John (book deadline day) turns into a massive (massive it is) day for poor old Dave.As the saying goes: ‘The best laid plans of podcast producers often go awry’, and Dave’s idea for the team to record remotely gets derailed quite spectacularly by a faulty alarm system. Brace yourselves for the most stressed you will probably ever hear one of the UK’s most unflappable men.Back to John, and he tells us early on that he’s feeling ‘absolutely dreadful’. Book deadline day is taking its toll, but luckily a text from Elis’s brother-in-law lifts his spirits, as does the arrival of a record in the post for poor old stressed Dave.There’s the start of a podcast feud with No Such Thing As A Fish, chat about successfully bartering with a supermarket, and the introduction of a new jingle that wouldn’t be out of place on Lou Reed’s Transformer.To get in touch with the show, email [email protected] lots of exclusive EJJR #content, join our Patreon at patreon.com/elisandjohnFor weekly visual highlights, head to youtube.com/@elisandjohn For everything else, head to elisandjohn.comThe Elis James and John Robins Show is a Significant Production  Hosted on Acast. See acast.com/privacy for more information.

Episode metadata supplied by the publisher feed · Published Sep 12, 2025

Embed this episode

NOW PLAYING

#471 - John’s Critical Path, Elis’s 0.0% Curry and Dave’s Not So Silent Alarm

0:00 1:05:13

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Elis James and John Robins?

This episode is 1 hour and 5 minutes long.

When was this Elis James and John Robins episode published?

This episode was published on September 12, 2025.

Can I download this Elis James and John Robins episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!