49th G7 summit, O'Leary's $14 Billion Refinery, Finland nuclear reactor | BDE 04.17.23 episode artwork

EPISODE · Apr 18, 2023 · 38 MIN

49th G7 summit, O'Leary's $14 Billion Refinery, Finland nuclear reactor | BDE 04.17.23

from Big Digital Energy · host collide.

Join the conversation shaping the future of energy.Collide is the community where oil & gas professionals connect, share insights, and solve real-world problems together. No noise. No fluff. Just the discussions that move our industry forward.Apply today at collide.io00:00 Intro01:42 Record level of global demand07:25 Europe's most powerful nuclear reactor10:17 G7 Accelerating growth of renewables18:59 O'Leary's $14 Billion Refinery23:07 Sussing out the UK & Europe37:48 Outrohttps://twitter.com/collide_iohttps://www.tiktok.com/@collide.iohttps://www.facebook.com/collide.iohttps://www.instagram.com/collide.iohttps://www.youtube.com/@collide_iohttps://bsky.app/profile/digitalwildcatters.bsky.socialhttps://www.linkedin.com/company/collide-digital-wildcatters

Episode metadata supplied by the publisher feed · Published Apr 18, 2023

Embed this episode

NOW PLAYING

49th G7 summit, O'Leary's $14 Billion Refinery, Finland nuclear reactor | BDE 04.17.23

0:00 38:01

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Big Digital Energy?

This episode is 38 minutes long.

When was this Big Digital Energy episode published?

This episode was published on April 18, 2023.

Can I download this Big Digital Energy episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!