5 Ideas to Mitigate the Scope Changes in Your Project - Part 1 of 2
from 5 Minutes Podcast with Ricardo Vargas · host Ricardo Viana Vargas
In this podcast, Ricardo talks about how can we minimize scope changes in a project. He explains that we need to have a connection between the functional scope, client-oriented, and the technical scope, that is team-oriented. And that we also should make a plan as detailed as possible. Next week, listen to the continuation of this podcast, where Ricardo will suggest three other control measures: the formalization, the phasing of the project and the rolling wave planning.
What this episode covers
In this podcast, Ricardo talks about how can we minimize scope changes in a project. He explains that we need to have a connection between the functional scope, client-oriented, and the technical scope, that is team-oriented. And that we also should make a plan as detailed as possible. Next week, listen to the continuation of this podcast, where Ricardo will suggest three other control measures: the formalization, the phasing of the project and the rolling wave planning.
NOW PLAYING
5 Ideas to Mitigate the Scope Changes in Your Project - Part 1 of 2
No transcript for this episode yet
Similar Episodes
Mar 26, 2026 ·1m
Jan 2, 2026 ·47m
Dec 21, 2025 ·46m