50 Million Miles of Power Transmission Lines by 2040. Is That a Joke? [💡 5 Ideas] episode artwork

EPISODE · Dec 4, 2025 · 11 MIN

50 Million Miles of Power Transmission Lines by 2040. Is That a Joke? [💡 5 Ideas]

from Climate CEOs: Scaling Startups

Here are today’s five topics on climate & clean energy, startup investment, AI for entrepreneurs, and mindfulness in leadership:1. 📊 CLIMATE DATA50 million miles of transmission lines are needed by 2040 to achieve climate goals.2. 💡 CEO TO KNOWCam Halliday @ Mantel ($32M for carbon capture)3. 💸 INVESTOR SPOTLIGHTDave Kirkpatrick @ SJF Ventures ($435M for impact startups)4. 🤖 AI INSIGHTAI as speechwriter for critical moments (in a rush)5. ⛰️ MINDFUL MOMENTMisery or strength: same workload, different ROI------------Join my EFI Climate CEO Peer Group:Become an EFI Climate CEO Fellow — North America’s top invite-only peer community for growth-stage CEOs in climate tech and sustainability. 100 CEOs and Mentors representing $40B in market value or investment assets.👉 https://www.entrepreneursforimpact.comGet my 4-Minute Newsletter: Climate CEOsFor entrepreneurs and investors: 5 quick ideas on climate data, CEOs to know, investor spotlights, AI insights, and mindfulness moments — drawn from lessons working with 400+ climate CEOs and investors, plus 25 years of meditation practice.👉 https://entrepreneursforimpact.substack.comLeave a Podcast Review. (All the cool kids do it.)No sponsors — just real conversations with climate leaders. If you found this episode valuable, please leave a review to help others discover it.👉 https://ratethispodcast.com/guides/where-can-people-leave-podcast-reviewsAbout the Host:Dr. Chris Wedding is a climate CEO coach, investor, serial founder, board member, professor, and occasional monk. For more on climate tech startups and leadership, connect on LinkedIn:👉 https://www.linkedin.com/in/christopherwedding--Cover image credit: BloombergNEF, 2023. (Note: Their projections for transmission lines go out to 2050, not 2040 as IEA does.)

Episode metadata supplied by the publisher feed · Published Dec 4, 2025

Embed this episode

NOW PLAYING

50 Million Miles of Power Transmission Lines by 2040. Is That a Joke? [💡 5 Ideas]

0:00 11:34

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Climate CEOs: Scaling Startups?

This episode is 11 minutes long.

When was this Climate CEOs: Scaling Startups episode published?

This episode was published on December 4, 2025.

Can I download this Climate CEOs: Scaling Startups episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!