EPISODE · Aug 27, 2023 · 36 MIN
51: I35 West
from Causality · host The Engineered Network
The I35W bridge over the Mississippi River carried 140,000 cars every day. Inspections in 1999 and 2003 showed damage to support plates that was dismissed as unimportant at the time. We look into how poor design checking and assumptions led to the bridge collapsing in 2007, costing the lives of 13 people.With John Chidgey.This show is Podcasting 2.0 Enhanced Only a Handful of T-Shirts Left! Reports: Collapse of I-35W Highway Bridge Minneapolis, Minnesota August 1, 2007 (PDF) General Information: I-35W Mississippi River bridge URS Corporation Sverdrup & Parcel Gusset Plate Articles: Design errors factor in 2007 bridge collapse NTSB releases final report Despite final NTSB report, some still have questions Videos: Inside a Catastrophic Minneapolis Bridge Collapse (YouTube) Litigation: NTSB is wrong about cause of bridge collapse Last Minneapolis Bridge Collapse Lawsuit Settled For $52.4 Million Support Causality on PatreonEpisode Gold Producers: 'r' and Steven Bridle.Episode Silver Producers: Mitch Biegler, Shane O'Neill, Lesley, Jared Roman, Joel Maher, Katharina Will, Chad Juehring, Dave Jones and Kellen Frodelius-Fujimoto.With thanks to Joe Stariha for the topic suggestion.
What this episode covers
The I35W bridge over the Mississippi River carried 140,000 cars every day. Inspections in 1999 and 2003 showed damage to support plates that was dismissed as unimportant at the time. We look into how poor design checking and assumptions led to the bridge collapsing in 2007, costing the lives of 13 people.
NOW PLAYING
51: I35 West
No transcript for this episode yet
Similar Episodes
Jun 26, 2026 ·2m
Jun 25, 2026 ·62m
Jun 22, 2026 ·1m
Jun 19, 2026 ·1m
Jun 18, 2026 ·57m
Jun 17, 2026 ·49m