EPISODE · Nov 27, 2023 · 1H 34M
#53 | From Small-Town Roots to Big-Time Impact: Deputy Andrew’s Journey - Andrew Wake
from My Life, My Story · host Lee & Debra Cloer
Andrew grew up in small-town Tabor, Iowa, and always assumed he would leave and settle in a large metropolis. But life’s turns led him right back to his hometown on the same street where he grew up. Don’t be deceived… he’s had plenty of run-ins and sobering experiences. From a law enforcement career to travels and adventures, there’s never a dull moment.Visit our website: My Life, My Story PodcastIf you have questions or comments, please email them to Debra and Lee at [email protected] by: Lee Cloer Designs 828 VibesJourney of Faith and Hope
Embed this episode
NOW PLAYING
#53 | From Small-Town Roots to Big-Time Impact: Deputy Andrew’s Journey - Andrew Wake
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.