#55 | Last Planner System, con Jose? Casas Rico episode artwork

EPISODE · Dec 28, 2016 · 56 MIN

#55 | Last Planner System, con Jose? Casas Rico

from OnSite | Podcast de Construcción

En este programa hablamos sobre Last Planner System con José Casas Rico, que nos cuenta en qué consiste esta metodología de planificación de obras de construcción para mejorar los plazos y los costes.

Episode metadata supplied by the publisher feed · Published Dec 28, 2016

Embed this episode

NOW PLAYING

#55 | Last Planner System, con Jose? Casas Rico

0:00 56:04

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of OnSite | Podcast de Construcción?

This episode is 56 minutes long.

When was this OnSite | Podcast de Construcción episode published?

This episode was published on December 28, 2016.

Can I download this OnSite | Podcast de Construcción episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!