Skip to content
#55 | Last Planner System, con José Casas Rico episode artwork

Dec 28, 2016 56 min

#55 | Last Planner System, con José Casas Rico

from Onsite Podcast de Construcción Hosted by Enrique Alario

En este programa hablamos sobre Last Planner System con José Casas Rico, que nos cuenta en qué consiste esta metodología de planificación de obras de construcción para mejorar los plazos y los costes.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

#55 | Last Planner System, con José Casas Rico

0:00 56:05

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Onsite Podcast de Construcción?

This episode is 56 minutes long.

When was this Onsite Podcast de Construcción episode published?

This episode was published on December 28, 2016.

Can I download this Onsite Podcast de Construcción episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.