#58 | Last Planner System, charla con los más cracks en España episode artwork

EPISODE · Jun 14, 2017 · 1H 44M

#58 | Last Planner System, charla con los más cracks en España

from Onsite Podcast de Construcción · host Enrique Alario

Debate sobre Last Planner System

Episode metadata supplied by the publisher feed · Published Jun 14, 2017

Embed this episode

NOW PLAYING

#58 | Last Planner System, charla con los más cracks en España

0:00 1:44:36

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Onsite Podcast de Construcción?

This episode is 1 hour and 44 minutes long.

When was this Onsite Podcast de Construcción episode published?

This episode was published on June 14, 2017.

Can I download this Onsite Podcast de Construcción episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!