#59 - What would you do if you could start over? episode artwork

EPISODE · Dec 1, 2023 · 50 MIN

#59 - What would you do if you could start over?

from The Crossing Gate. Model railroad discussion. · host Twin Cities Division NMRA

Are you going to start over with your layout, or have you been thinking of modeling something else altogether? We discuss those options in this podcast. We asked our panel what changes they would make. Different scale? Era? Railroad of choice?Our panel for this episode is Ken Borowski, Joe Binish, Mike Jordan, and your host, Thomas W. Gasior MMR.We discuss DCC systems and operations changes, including scenery and layout design.Two Plastic Garbage Twist Ties sponsor our podcast.Plus, the usual outtakes. 

Episode metadata supplied by the publisher feed · Published Dec 1, 2023

Embed this episode

NOW PLAYING

#59 - What would you do if you could start over?

0:00 50:43

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Crossing Gate. Model railroad discussion.?

This episode is 50 minutes long.

When was this The Crossing Gate. Model railroad discussion. episode published?

This episode was published on December 1, 2023.

Can I download this The Crossing Gate. Model railroad discussion. episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!