6/12/25 SCCRTC P4 - ZEPRT Update - Intro episode artwork

EPISODE · Jun 20, 2025 · 11 MIN

6/12/25 SCCRTC P4 - ZEPRT Update - Intro

from Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks

ZEPRT Update - Project IntroZero Emission Passenger Rail and Trail Project UpdateFollowing a presentation by Riley Gerbrandt, Associate Engineer and Mark McLaren, Project Manager from HDR, Inc., the Commission discussed the results of Milestone 4 in the development of the project concept report. The Draft Project Concept Executive Summary was included in the report and posted to the website as an Attachment to item 31. The full Concept Report, expected later this summer, will include the Project Purpose and Need, Conceptual Project Definition, Transit Ridership and Revenue Forecast, Station Locations and Access, Conceptual Rail and Trail Alignments, Rail Operations Plan and Vehicle Type, Conceptual Rail Transit Station and Layover and Maintenance Facility Locations, Conceptual Passenger and Freight Rail Interface Assessment, Railroad Bridge Assessment and Network Infrastructure, Conceptual Project Cost Estimates, Environmental Screening, Funding and Regulatory Strategy, and Public Engagement Findings. The virtual open house for Milestone 4 went live on June 12, 2025. The Commission directed staff to prepare and present a financial report utilizing the data in the project concept report to calculate the amount required to cover 20%, 30%, 40% and 50% of capital costs and cover 100% of operations and maintenance costs with local funds, and provide a table of taxes that could provide such local funds.The full agenda and highlights are here:https://www.sccrtc.org/meetings/regional-transportation-commission/agendas/The video from Community TV is here:https://www.youtube.com/playlist?list=PLo9N9AsVOVvRZ52uJW8KW1xLX7iizMk85

Episode metadata supplied by the publisher feed · Published Jun 20, 2025

Embed this episode

NOW PLAYING

6/12/25 SCCRTC P4 - ZEPRT Update - Intro

0:00 11:33

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks?

This episode is 11 minutes long.

When was this Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks episode published?

This episode was published on June 20, 2025.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!