EPISODE · Jul 30, 2020 · 28 MIN
#63 Nine Days to Build a Hospital
from Engineering Matters
When Dan Harmer received a call in March that told him to clear his schedule and prepare for a meeting, he knew it would be important, but had no idea quite what would be asked of him. With Covid-19 spreading exponentially, and the National Health Service looking increasingly vulnerable, he was the man chosen to build an emergency Nightingale hospital in Birmingham. The catch? He had less than two weeks before the first patients were expected to arrive. This is the story of how the construction industry, sometimes criticised for poor productivity, gave everything it had to meet a seemingly impossible deadline when the country needed it most. And how technology enabled the immense human effort to win through. Special thanks to Autodesk Construction Solutions, Interserve Construction and the National Health Service. Guests Dan Harmer, Project Manager, Interserve ConstructionMatt Keen, Construction Industry Strategist, Autodesk Construction SolutionsMichelle Jeffs, Account Manager, Autodesk Construction Solutions Supporter Autodesk is the Architecture, Engineering and Construction (AEC) industry’s partner in the future of design and construction.The post #63 Nine Days to Build a Hospital first appeared on Engineering Matters.
NOW PLAYING
#63 Nine Days to Build a Hospital
No transcript for this episode yet
Similar Episodes
Jun 20, 2026 ·31m
Jun 20, 2026 ·24m
Jun 20, 2026 ·42m
Jun 20, 2026 ·26m
Jun 20, 2026 ·22m
Jun 20, 2026 ·37m