EPISODE · Jun 9, 2021 · 39 MIN
66: HS2, HPC and Leisure Centre Design
from Re:Construction · host The Construction Index
Bishop has had a tour of the HS2 Chilterns Tunnel south portal site, Taylor has been watching TV; they chat about their findings. They also discuss leisure centre design shortcomings. Plus: What not to say in a press release.
Embed this episode
NOW PLAYING
66: HS2, HPC and Leisure Centre Design
0:00
39:35
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Re:Construction?
This episode is 39 minutes long.
When was this Re:Construction episode published?
This episode was published on June 9, 2021.
Can I download this Re:Construction episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!