66: HS2, HPC and Leisure Centre Design episode artwork

EPISODE · Jun 9, 2021 · 39 MIN

66: HS2, HPC and Leisure Centre Design

from Re:Construction · host The Construction Index

Bishop has had a tour of the HS2 Chilterns Tunnel south portal site, Taylor has been watching TV; they chat about their findings. They also discuss leisure centre design shortcomings. Plus: What not to say in a press release.

Episode metadata supplied by the publisher feed · Published Jun 9, 2021

Embed this episode

NOW PLAYING

66: HS2, HPC and Leisure Centre Design

0:00 39:35

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Re:Construction?

This episode is 39 minutes long.

When was this Re:Construction episode published?

This episode was published on June 9, 2021.

Can I download this Re:Construction episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!