Skip to content
66 - Underground Mine Planning Process episode artwork

Jun 5, 2024 8 min

66 - Underground Mine Planning Process

from Fresh Thinking by Snowden Optiro

In this episode of Fresh Thinking by Snowden Optiro, join us as our Principal Consultant Chris Jones and Allan Earl, Executive Consultant, exploring the topic of underground mine planning process. This podcast at a glance: 00:05 Introduction 00:40 Recent Underground Projects 01:05 Underground Mine Planning and Design Process 01:50 Specifics for Scoping Studies 02:25 Mining Method Selection 03:40 Development Design Layout 04:30 Preliminary Stope Designs 05:10 Mining Schedule Setup 07:10 Schedule and Reporting 08:10 Conclusion and Future Topics Join our experts as they explore the topic of Underground Mine Planning Process in the episode 66 of the Fresh Thinking podcast. If you'd like to connect with Chris and Allan, please reach out to them at [email protected]. This podcast is also available as an audio podcast on @Libsyn, @Spotify, @Apple Podcasts, @Google Podcasts. These podcasts are for those working in the mining industry. Snowden Optiro - Mining Advisory, Consulting and Professional Development.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

66 - Underground Mine Planning Process

0:00 8:57

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Fresh Thinking by Snowden Optiro?

This episode is 8 minutes long.

When was this Fresh Thinking by Snowden Optiro episode published?

This episode was published on June 5, 2024.

Can I download this Fresh Thinking by Snowden Optiro episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.