73: Your Future Uber May Be An Aircraft From Joby episode artwork

EPISODE · May 7, 2024 · 8 MIN

73: Your Future Uber May Be An Aircraft From Joby

from Batteries Included · host Batteries Included

We caught up with Joby Aviation Chief Product Officer (CPO) Eric Allison at #DriftX 2024 to bring us up to speed with the progress the company is making with its aircraft and its future role as an air taxi.

We caught up with Joby Aviation Chief Product Officer (CPO) Eric Allison at #DriftX 2024 to bring us up to speed with the progress the company is making with its aircraft and its future role as an air taxi.

NOW PLAYING

73: Your Future Uber May Be An Aircraft From Joby

0:00 8:02

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Batteries Included?

This episode is 8 minutes long.

When was this Batteries Included episode published?

This episode was published on May 7, 2024.

What is this episode about?

We caught up with Joby Aviation Chief Product Officer (CPO) Eric Allison at #DriftX 2024 to bring us up to speed with the progress the company is making with its aircraft and its future role as an air taxi.

Can I download this Batteries Included episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!