EPISODE · May 7, 2024 · 8 MIN
73: Your Future Uber May Be An Aircraft From Joby
from Batteries Included · host Batteries Included
We caught up with Joby Aviation Chief Product Officer (CPO) Eric Allison at #DriftX 2024 to bring us up to speed with the progress the company is making with its aircraft and its future role as an air taxi.
Embed this episode
NOW PLAYING
73: Your Future Uber May Be An Aircraft From Joby
0:00
8:02
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Batteries Included?
This episode is 8 minutes long.
When was this Batteries Included episode published?
This episode was published on May 7, 2024.
Can I download this Batteries Included episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!