EPISODE · Sep 28, 2021 · 7 MIN
#78: A Simple, Profitable Change Order System
from Building Optimal
A messy or worse, non-existent, change order system can sink a home builder. What should be a source of profits is often a place of loss and chaos. We can fix that in a hurry, though. Here is my company’s strategy to change order the right way.Have any topics you want me to discuss, guests to interview, or feedback about the show? DM me on Instagram @buildingoptimal or send me an email at [email protected]. Learn more about Lowe’s for Pros HERE Sign up for the best newsletter on the planet HERE (sign-up top of home page) BTW, refer our newsletter to 3 other builders and get a copy of my client pre-construction guide. Refer 10 and get a 20-minute Q&A with me. Details of how in the newsletters, my friends.
Embed this episode
Ready to play
#78: A Simple, Profitable Change Order System
No transcript for this episode yet
Similar Episodes
No similar episodes found.