Skip to content
#84 Change Orders episode artwork

Feb 13, 2024 42 min

#84 Change Orders

from Two Designers & A Builder Walk Into A Bar Hosted by 2d1bbar

When it comes to building a custom home, just remember, this is a prototype! It's never been built before! With that being said, the inevitible will happen and that's what we call a change order. This isn't always a bad thing and those two words more often get a bad wrap! Today the three of us discuss what change orders are, why they happen, ways to try to avoid some of them and why they have an associated cost to them. Want to contact us? [email protected] Steve Rudin aka The Builder, [email protected] Steve Iltis aka The Home Designer, [email protected] Shannon Vestal aka The Interior Designer, [email protected] We love hearing from you so keep the comments and show requests coming!! Be sure to follow, subscribe, rate and share the show!

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

#84 Change Orders

0:00 42:54

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Two Designers & A Builder Walk Into A Bar?

This episode is 42 minutes long.

When was this Two Designers & A Builder Walk Into A Bar episode published?

This episode was published on February 13, 2024.

Can I download this Two Designers & A Builder Walk Into A Bar episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.