9/5/24 SCCRTC - P6 - Hwy 1 Auxiliary Lane Cost Overrun Presentation  episode artwork

EPISODE · Sep 11, 2024 · 10 MIN

9/5/24 SCCRTC - P6 - Hwy 1 Auxiliary Lane Cost Overrun Presentation

from Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks

9/5/24 RTC Episode NotesPresentation by Sarah Christensen of RTC staff, Madeline Jacobson, Caltrans Project Manager, and Tim Cambell, Caltrans deputy district director for construction and project delivery.The meeting discusses a request for additional funding for the Highway 141st Avenue to Soquel Drive auxiliary lanes and bus-on-shoulder project, which also includes the Chanticleer bicycle and pedestrian overcrossing. Caltrans initially requested $5 million to cover cost overruns in the construction phase, but that amount has been reduced to $4 million. The current recommendation is for the commission to authorize up to $2.5 million to keep the project moving without exceeding current fiscal constraints.The project, now 60% complete, has faced challenges including design changes, unforeseen conditions, and safety issues, all contributing to increased costs. These include replacing crash cushions, installing pedestrian access routes, and dealing with unsuitable materials. Despite the challenges, the team has made significant progress, including completing the northbound and southbound widening and retaining walls, and the pedestrian overcrossing is nearly finished.Caltrans proposes a phased funding approach, seeking an additional $2.5 million now and addressing the remaining needs in November as part of the Measure D five-year plan update. The presentation concludes with a focus on project successes and continued collaboration to minimize further risks and ensure completion by spring 2025.Agenda, Minutes, Handouts and Highlightshttps://www.sccrtc.org/meetings/regional-transportation-commission/agendas/Original videohttps://communitytv.org/watch/government-demand/

Episode metadata supplied by the publisher feed · Published Sep 11, 2024

Embed this episode

NOW PLAYING

9/5/24 SCCRTC - P6 - Hwy 1 Auxiliary Lane Cost Overrun Presentation

0:00 10:07

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks?

This episode is 10 minutes long.

When was this Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks episode published?

This episode was published on September 11, 2024.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!