EPISODE · Aug 16, 2024 · 16 MIN
A massive replacement of lead water pipes is in its early stages in Buffalo
from Buffalo All Local
A $500 million project that will see the city of Buffalo replace 40,000 water lines is in its beginning stages. The best part? There's no cost for residents. Buffalo Water Board Chair OJ McFoy tells us how the city plans to fund the project and how you can contribute.
Embed this episode
NOW PLAYING
A massive replacement of lead water pipes is in its early stages in Buffalo
0:00
16:56
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Buffalo All Local?
This episode is 16 minutes long.
When was this Buffalo All Local episode published?
This episode was published on August 16, 2024.
Can I download this Buffalo All Local episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!