A massive replacement of lead water pipes is in its early stages in Buffalo episode artwork

EPISODE · Aug 16, 2024 · 16 MIN

A massive replacement of lead water pipes is in its early stages in Buffalo

from Buffalo All Local

A $500 million project that will see the city of Buffalo replace 40,000 water lines is in its beginning stages. The best part? There's no cost for residents. Buffalo Water Board Chair OJ McFoy tells us how the city plans to fund the project and how you can contribute.

Episode metadata supplied by the publisher feed · Published Aug 16, 2024

Embed this episode

NOW PLAYING

A massive replacement of lead water pipes is in its early stages in Buffalo

0:00 16:56

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Buffalo All Local?

This episode is 16 minutes long.

When was this Buffalo All Local episode published?

This episode was published on August 16, 2024.

Can I download this Buffalo All Local episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!