EPISODE · May 14, 2026 · 1 MIN
A new $37 million recovery package for victims of the Longwood bushfire
from LiSTNR Goulburn Valley Local News · host LiSTNR
Plus - Moira Shire seeking feedback on its new Draft Budget. See omnystudio.com/listener for privacy information.
Embed this episode
NOW PLAYING
A new $37 million recovery package for victims of the Longwood bushfire
0:00
1:08
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of LiSTNR Goulburn Valley Local News?
This episode is 1 minute long.
When was this LiSTNR Goulburn Valley Local News episode published?
This episode was published on May 14, 2026.
Can I download this LiSTNR Goulburn Valley Local News episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!