Skip to content
A new solution to optimize LNG pre-treatment episode artwork

Jun 2, 2021 13 min

A new solution to optimize LNG pre-treatment

from The Main Column Hosted by Hydrocarbon Processing

Hydrocarbon Processing sat down with Peg Greene and Tobias Eckardt, both from BASF, to discuss a new technology for the LNG industry. This new unit replaces the standard mol sieve dehydration unit in an LNG pre-treatment lineup. This discussion focuses on the operations of an LNG plant's pre-treatment section, as well as the benefits this new technology can bring to the LNG industry. For comments or feedback, please contact: [email protected] Copyright ©Gulf Energy Information 2021

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

A new solution to optimize LNG pre-treatment

0:00 13:39

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of The Main Column?

This episode is 13 minutes long.

When was this The Main Column episode published?

This episode was published on June 2, 2021.

Can I download this The Main Column episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.