A new solution to optimize LNG pre-treatment episode artwork

EPISODE · Jun 2, 2021 · 13 MIN

A new solution to optimize LNG pre-treatment

from The Main Column · host Hydrocarbon Processing

  Hydrocarbon Processing sat down with Peg Greene and Tobias Eckardt, both from BASF, to discuss a new technology for the LNG industry. This new unit replaces the standard mol sieve dehydration unit in an LNG pre-treatment lineup. This discussion focuses on the operations of an LNG plant's pre-treatment section, as well as the benefits this new technology can bring to the LNG industry. For comments or feedback, please contact: [email protected] Copyright ©Gulf Energy Information 2021      

Episode metadata supplied by the publisher feed · Published Jun 2, 2021

Embed this episode

NOW PLAYING

A new solution to optimize LNG pre-treatment

0:00 13:39

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Main Column?

This episode is 13 minutes long.

When was this The Main Column episode published?

This episode was published on June 2, 2021.

Can I download this The Main Column episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!