EPISODE · Dec 11, 2025 · 25 MIN
A Tour of the Essex Junction Water Treatment Plant
from The Natural Curiosity Project · host Dr. Steven Shepard
Join me on a tour of the Essex Junction Water Treatment Facility. It's a lot more interesting than you might think!
Embed this episode
Ready to play
A Tour of the Essex Junction Water Treatment Plant
0:00
25:21
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of The Natural Curiosity Project?
This episode is 25 minutes long.
When was this The Natural Curiosity Project episode published?
This episode was published on December 11, 2025.
Can I download this The Natural Curiosity Project episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!