A Tour of the Essex Junction Water Treatment Plant episode artwork

EPISODE · Dec 11, 2025 · 25 MIN

A Tour of the Essex Junction Water Treatment Plant

from The Natural Curiosity Project · host Dr. Steven Shepard

Join me on a tour of the Essex Junction Water Treatment Facility. It's a lot more interesting than you might think!

Episode metadata supplied by the publisher feed · Published Dec 11, 2025

Embed this episode

Ready to play

A Tour of the Essex Junction Water Treatment Plant

0:00 25:21

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Natural Curiosity Project?

This episode is 25 minutes long.

When was this The Natural Curiosity Project episode published?

This episode was published on December 11, 2025.

Can I download this The Natural Curiosity Project episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!