A1 European Portuguese News | Australia's Data Centre Boom Faces a Cost Question episode artwork

EPISODE · Sep 4, 2026 · 6 MIN

A1 European Portuguese News | Australia's Data Centre Boom Faces a Cost Question

from Learn Portuguese A1 | Slow Easy Portuguese News, Daily

Learn European Portuguese through today’s real news. Slow, clear European Portuguese at A1, with a full transcript and English translation.In this episode: Australia's data centres are growing fast, but locals worry about noise, water, energy, and the environment. Also: The Japanese yen rises sharply as investors expect the Bank of Japan may raise interest rates soon.Hoje: Centros de dados na Austrália · Iene sobe no Japão.Today’s European Portuguese focus: estar a + infinitive (to be doing) = to be doing. Vocabulary: centro de dados (data centre), zumbido (hum), gás natural (natural gas).Learn more from today’s episode with the full podcast transcript, English translation, vocabulary explanations, and extra learning materials: https://linguawire.com/episodes/portuguese-a1-2026-09-04 Hosted on Acast. See acast.com/privacy for more information.

Episode metadata supplied by the publisher feed · Published Sep 4, 2026

Embed this episode

Ready to play

A1 European Portuguese News | Australia's Data Centre Boom Faces a Cost Question

0:00 6:13

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Learn Portuguese A1 | Slow Easy Portuguese News, Daily?

This episode is 6 minutes long.

When was this Learn Portuguese A1 | Slow Easy Portuguese News, Daily episode published?

This episode was published on September 4, 2026.

Can I download this Learn Portuguese A1 | Slow Easy Portuguese News, Daily episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!