Ada’s New Covered Bridge Park Opens | Grand Rapids News episode artwork

EPISODE · Aug 26, 2026 · 1 MIN

Ada’s New Covered Bridge Park Opens | Grand Rapids News

from Grand Rapids News Today | 2 Min News | The Daily News Now!

Ada’s brand-new Covered Bridge Park just opened—and it’s already packed with families ready to play. Spanning 15 acres along the Thornapple River, this vibrant space features a playground, splash pad, pickleball courts, and dog runs—all built through a community-driven $8.5 million campaign called “Connection Community Capital.” Locals didn’t need an official opening announcement—people showed up as soon as the gates swung open, proving this park hit the mark. It’s just the first step in Ada Township’s bigger vision to connect neighbors and build lasting joy, one neighborhood at a time. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/4b978508e94b5d17

Episode metadata supplied by the publisher feed · Published Aug 26, 2026

Embed this episode

Ready to play

Ada’s New Covered Bridge Park Opens | Grand Rapids News

0:00 1:22

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Grand Rapids News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Grand Rapids News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on August 26, 2026.

Can I download this Grand Rapids News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!