Adler Enoksen talks about the engineering of today, tomorrow and beyond for some of Norway’s most complex infrastructure projects episode artwork

EPISODE · Mar 26, 2025 · 33 MIN

Adler Enoksen talks about the engineering of today, tomorrow and beyond for some of Norway’s most complex infrastructure projects

from The Okana Podcast · host Okana

Adler Enoksen has worked on some of the most advanced, complex and detailed infrastructure and engineering projects in Norway, including the Follo Line and the Rogfast tunnel. As Director for Hydropower Plants and Caverns at Implenia Norway, Adler has a background as an engineering geologist and a specialism in substructure construction. In this Okana podcast, host Dr Graham Kelly delves into Adler’s fascinating career (to the envy of many engineers around the world) and vast knowledge to understand how he leads successful, large complex projects for both the Norwegian Government and private sector clients.  The conversation also leans towards risk and safety and how these are measure, monitored and managed, and what parts data and digital play from the planning stage through to breaking ground.  

Adler Enoksen has worked on some of the most advanced, complex and detailed infrastructure and engineering projects in Norway, including the Follo Line and the Rogfast tunnel. As Director for Hydropower Plants and Caverns at Implenia Norway, Adler has a background as an engineering geologist and a specialism in substructure construction. In this Okana podcast, host Dr Graham Kelly delves into Adler’s fascinating career (to the envy of many engineers around the world) and vast knowledge to understand how he leads successful, large complex projects for both the Norwegian Government and private sector clients.  The conversation also leans towards risk and safety and how these are measure, monitored and managed, and what parts data and digital play from the planning stage through to breaking ground.

NOW PLAYING

Adler Enoksen talks about the engineering of today, tomorrow and beyond for some of Norway’s most complex infrastructure projects

0:00 33:54

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of The Okana Podcast?

This episode is 33 minutes long.

When was this The Okana Podcast episode published?

This episode was published on March 26, 2025.

What is this episode about?

Adler Enoksen has worked on some of the most advanced, complex and detailed infrastructure and engineering projects in Norway, including the Follo Line and the Rogfast tunnel. As Director for Hydropower Plants and Caverns at Implenia Norway, Adler...

Can I download this The Okana Podcast episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!