EPISODE · Aug 25, 2026 · 25 MIN
AEMO warns AI data centres will drain power grid
from PM · host Australian Broadcasting Corporation
The Australian Energy Market Operator is warning that data centres will put huge pressure on the national electricity grid over the next decade.
Embed this episode
Ready to play
AEMO warns AI data centres will drain power grid
0:00
25:44
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of PM?
This episode is 25 minutes long.
When was this PM episode published?
This episode was published on August 25, 2026.
Can I download this PM episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!