AI buildout squeezes grids, fiber routes, and town halls — July 28, 2026 episode artwork

EPISODE · Jul 28, 2026 · 9 MIN

AI buildout squeezes grids, fiber routes, and town halls — July 28, 2026

from The Data Center Daily · host The Data Center Daily — Lantern Podcasts

NextEra Energy’s Dominion bid and Iowa nuclear restart put utility scale at the center of AI load growth, while Verizon’s $1 billion Google fiber deal and new local siting fights show the buildout straining networks, grids, and permitting. In this episode: Top stories: 1. NextEra aims to cash in on surging power demand from data centers - E&E News by POLITICO — E&E News https://www.eenews.net/articles/nextera-aims-to-cash-in-on-surging-power-demand-from-data-centers/ 2. Verizon signs $1B dark fiber deal with Google - Telecompetitor — Telecompetitor https://www.telecompetitor.com/verizon-signs-1b-dark-fiber-deal-with-google/ 3. States cannot be granted filing rights under Section 205 of the Federal Power Act | Utility Dive — Utility Dive https://www.utilitydive.com/news/states-ferc-filing-rights-section-205-pjm/826170/ 4. Plymouth Township opposes Conshohocken data center - WHYY — WHYY https://whyy.org/articles/conshohocken-data-center-proposal-plymouth-township-pushes-back/ 5. Namyangju Mega Data Center Stalls Over Power, Water Supply - Seoul Economic Daily — Seoul Economic Daily https://en.sedaily.com/technology/2026/07/27/namyangju-mega-data-center-stalls-over-power-water-supply Follow and rate The Data Center Daily on Apple Podcasts or Spotify. Feedback? Email [email protected]

Episode metadata supplied by the publisher feed · Published Jul 28, 2026

Embed this episode

Ready to play

AI buildout squeezes grids, fiber routes, and town halls — July 28, 2026

0:00 9:37

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Data Center Daily?

This episode is 9 minutes long.

When was this The Data Center Daily episode published?

This episode was published on July 28, 2026.

Can I download this The Data Center Daily episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!