We track the pivot from Bitcoin mining to Tier 3 AI data centers, focusing on how contracts turn into energized megawatts. From Denton to Childress, GB200 pilots to GB300 deployments, we weigh execution risk, capex strategy, and the talent it takes to scale.• Bitcoin volatility as noisy backdrop to long-cycle buildouts• Contracts versus delivery as the real moat• CoreWeave–Core Scientific Denton progress despite weather delays• BitDeer GB200 pilots and the challenge of future proofing• BitZero B300 deployment and power allocation strategy• Hive with Bell Canada ahead of schedule on HPC revenue ramp• WhiteFiber brownfield retrofits and client count growth• DigiPower ARMS 200 standardized modular rollouts• IREN Childress CSP build for Microsoft at hyperscale• Cost per megawatt spread and financing implications• Talent as a lever, highlighted by Soluna’s new CFOCheck the Miner Madness 5.0 leaderboard and sign up for the Friday newsletter at powermininganalysis.comAnthonys Info:Website:https://www.powermininganalysis.comX: https://twitter.com/cazenove_ukPatreon:https://www.patreon.com/Cazenove_UKBryce's Info:X:https://twitter.com/McnallieMPatreon:https://www.patreon.com/McNallieMoneyMerch:https://shop.mcnalliemoney.com/Website:https://www.mcnalliemoney.comBusiness Inquiries:Email - [email protected]

Episode metadata supplied by the publisher feed · Published Jan 20, 2026

Embed this episode

We track the pivot from Bitcoin mining to Tier 3 AI data centers, focusing on how contracts turn into energized megawatts. From Denton to Childress, GB200 pilots to GB300 deployments, we weigh execution risk, capex strategy, and the talent it takes to scale. • Bitcoin volatility as noisy backdrop to long-cycle buildouts • Contracts versus delivery as the real moat • CoreWeave–Core Scientific Denton progress despite weather delays • BitDeer GB200 pilots and the challenge of future proofing • ...

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

AI Infrastructure Delivery & Execution: BITZ, HIVE, SLNH, IREN, CORZ, DGXX & BTDR

0:00 42:19

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Power Analysis?

This episode is 42 minutes long.

When was this Power Analysis episode published?

This episode was published on January 20, 2026.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Power Analysis episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.